Uncategorized

Registration for the next round robin test on TR 10 is now possible for all interested parties. The registration form contains all important information: Registration TR10 RV-2.0 Expected schedule: Registration period 01.12.2022 bis 06.01.2023 RV-2.0 Processing period I 09.01. bis 05.02.2023 RV-2.0 Processing period II 27.02. bis 26.03.2023 ...

The Technical Committee Power Curve (FA LK) has decided to publish the following statement on the use of anemometers classified according to IEC 61400-12-1:2017 in the field of power curve measurement. 220505 Statement FALK Anemometer Classification...

The Technical committee for Electrical Characteristics votes for an alteration of revison 25 of the Technical Guideline Part 3 “Determination of the Electrical Characteristics of Power Generating Units and Systems, Storage Systems as well for their Components in Medium-, High- and Extra-High Voltage Grids”. The alteration...

WordPress Cookie Plugin von Real Cookie Banner