Uncategorized

The Technical committee for power curve votes for an alteration of revison 17 of the Technical Guideline Part 2 "Determination of Power Curves and Standardised Energy Yields". The alteration affects formula (2-2) and its explanation on page 3 of revision 17 of the Technical Guideline 2...

The Technical committee for Wind Potential votes for an alteration of section C.2.3 of appendix C of revision 10 of the Technical Guideline Part 6. The alteration is needed to clarify the purpose of section C.2.3. Resolution 24.09.2018 Alteration of appendix C, section C.2.3...

Berlin, 2 May 2018 – Public and bilingual consultation on the FGW regulations for proof of grid connection conformity in accordance with Regulation (EU) 2016/631 of 14 April 2016 (Requirements for Generators, RfG)   For the first time, a public consultation procedure will be conducted in German...

WordPress Cookie Plugin von Real Cookie Banner